Saturday, October 4th!

Saturday the 4th saw our hard-working volunteers whittle down our punch list to just a few remaining items.  The sod installed last week looks fantastic and we thank a friendly neighbor for watering the lawn when Mother Nature gave us a dry week.  The bathroom sink faucet and drain were connected.  The kitchen sink was installed and the faucet connected.  The range hood was installed and vented outside.  The remaining closet shelves were installed with help from our proud homeowner.  The lighting in the stairwell was completed, then a handrail was installed.  The remaining trim has been caulked and sanded in preparation for our clean-up and final paint touch-up next weekend.  Thanks to Angelina’s Pizza for the donated lunch.  On a cool rainy day, the hot pizza was a welcome treat.

Group Pic, Saturday, Oct 4th

Comments are closed.